Subway Construction Set

5.     Signaling

Signaling at the moment is very rudimentary in the SCS. 3 aspect signals are available in 3 different formats, wall, wall narrow, and pole. Additional signal types are planned for Phase II, though these will require scripting to function similar to prototypical signals. Generally, signals should be placed prior to any switch which may prevent forward travel. For a switch which allows either a diverging route or forward route, there’s no need for a signal (as the control tower should have it set correctly, and if set incorrectly, still will allow the train to pass without any possibility of derailment). In the future, signals which indicate both the status of the forward and diverging route will be included. Signals should also be present before and after each station platform. In prototypical operation, these are actually 2 aspect signals, as they either indicate stop or caution, never proceed. Occasionally mid-station signals are used as well, but in Trainz this would serve no actual purpose. Signals may also be placed in long tunnel sections between stations.

Chapters: 1. Subway background
  2. Basic Construction Pointers
  3. The Pieces
  4. Construction
  6. Operation
  7. Phase II